IBM RS/6000 SP Manual do Utilizador

Consulte online ou descarregue Manual do Utilizador para Unidades de distribuição de energia (PDUs) IBM RS/6000 SP. IBM RS/6000 SP User's Manual Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 114
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes

Resumo do Conteúdo

Página 1 - SP Switch Service Guide

RS/6000 SPSP Switch Service GuideGA22-7443-04IBM

Página 2

viii RS/6000 SP: SP Switch Service Guide

Página 3

Multi-switch frame (F/C 2030/1)5-10 RS/6000 SP: SP Switch Service Guide

Página 4

Table 5-5. Multi-switch frame (F/C 2030/1)AssemblyindexPart number Units Description1 SPS Switch Assembly2 54G3281 16 Screw, Phil Pan Hd M5 x 123 93G1

Página 5 - Contents

5-12 RS/6000 SP: SP Switch Service Guide

Página 6

NoticesThis information was developed for products and services offered in the U.S.A.IBM may not offer the products, services, or features discussed i

Página 7

Electronic emissions noticesFederal Communications Commission (FCC) statementThis equipment has been tested and found to comply with the limits for a

Página 8

For installations in Japan:The following is a summary of the VCCI Japanese statement in the box above. This is a Class A productbased on the standard

Página 9

A-4 RS/6000 SP: SP Switch Service Guide

Página 10

IndexNumerics0375867 5-1104H9469 5-1108J5557 5-1111J3975 5-811J3976 5-811J3977 5-811J3978 5-811J3979 5-811J3980 5-811J3981 5-811J3982 5-811J5189 5-111

Página 11 - Safety notices

frame locations 2-3, 2-5, 2-6frame naming standard 2-1frame supervisor verification 3-5front chassis cable, SPS 1-8front view of 49-inch frame locatio

Página 12

SPS assembly, placing into service position 3-9SPS assembly, removing 4-2SPS assembly, replacing 4-2SPS assembly, replacing from service position 3-9S

Página 13 - Caution notices

Safety and environmental noticesFor general information concerning safety, refer toElectrical Safety for IBM Customer Engineers,S229-8124. For a copy

Página 14

X-4 RS/6000 SP: SP Switch Service Guide

Página 15 - Environmental notices

Reader’s comments – We’d like to hear from youRS/6000 SPSP Switch Service GuidePublication No. GA22-7443-04Overall, how satisfied are you with the inf

Página 16

Readers’ Comments — We’d Like to Hear from YouGA22-7443-04GA22-7443-04IBMCut or FoldAlong LineCut or FoldAlong LineFold and Tape Please do not staple

Página 19 - Summary of changes

DANGERBefore you connect the power cable of this product to ac power, verify that the power receptacleis correctly grounded and has the correct voltag

Página 20

DANGERThe remaining steps of the procedure contain measurements that are taken with power on.Remember that hazardous voltages are present. (SPSFD013)D

Página 21 - SP Switch MAPs

CAUTION:The covers are to be closed at all times except for service by trained service personnel.(SPSFC003)CAUTION:When the unit is being serviced, th

Página 22

CAUTION:v When moving frames into position, team members should work together. Using one person oneach corner of the frame can prevent strain.v In rai

Página 23 - Step 0590-001

This product might contain nickel-cadmium or lithium batteries in communication adapters. The batteriesmust be recycled or disposed of properly. Recyc

Página 24 - P/N 77G0818

About this bookThis book is part of the RS/6000®SP™hardware service library and applies to the RS/6000 SP Switch.Use this book to assist you in perfor

Página 25 - Step 0600-003

How to send your commentsYour feedback is important in helping to provide the most accurate and highest quality information. If youhave any comments a

Página 26 - Step 0600-007

Summary of changesGA22-7443-04This edition contains replaces GA22-7443-03 and any update versions made to that level and makes themobsolete. This edit

Página 28 - Step 0600-012

xviii RS/6000 SP: SP Switch Service Guide

Página 29 - Step 0600-016

Chapter 1. Maintenance Analysis Procedures (MAPs)This chapter provides information for identifying problems and guides you to the most likely failed F

Página 30 - Step 0600-020

FRUs include: Fans, circuit breaker/LED card, switch supervisor card, switch power card(s),inner chassis cable, front chassis cable, complete assembly

Página 31 - Step 0600-024

There are two LEDs on the front of each SP Switch. For quick reference, their definitions are as follows:Environment (Yellow)Off No environmental prob

Página 32 - Step 0600-028

Table 1-1. Switch problem diagnosticsPriority Message or condition Action1(1 of 3)Environmental problemsv Errpt: “Failure...”v Log: “Shutdown: Voltage

Página 33 - SP Switch power (MAP 0610)

SP Switch environment (MAP 0600)Purpose of this MAPThis MAP provides diagnostic information for switch problems that are related to the operatingenvir

Página 34 - Step 0610-004

Step 0600-004Perspectives indicated a shutdown condition and Table 1-2 on page 1-5 directed you to this step.1. One or more of the following condition

Página 35 - Step 0610-009

3. Is the measured resistance now within the acceptable range?v If yes, go to “Step 0600-017” on page 1-10 to verify fix.v If no, go to “Step 0600-008

Página 36 - Step 0610-012

Table 1-4. Fan failure diagnosticsPriority Component Action1(1 of 5)Fan 1, 2, 3, 4 or 5a. Check specified fans for blockages or loose cableconnections

Página 37 - SP Switch function (MAP 0620)

6. Check the Environmental (yellow) LED for an ON or FLASHING condition.7. Is the Environmental (yellow) LED ON or FLASHING?v If the Environmental LED

Página 38 - Step 0620-003

RS/6000 SPSP Switch Service GuideGA22-7443-04IBM

Página 39

2. Remove blockage.3. If required, put the switch into service position (refer to “Service position procedures” on page 3-9).4. With all cables replug

Página 40

2. Remove the switch supervisor card (refer to “Removing the switch supervisor card” on page 4-4).3. Using a digital multimeter, measure resistance at

Página 41 - Step 0620-004

Step 0600-025You have a PS1Fail problem1. Replace power supply card PS1.2. Reinstall the SPS front panel assembly, being careful to align the guide pi

Página 42 - System Service Guide

Step 0600-029You have a PSFuseGood problem that did not go away when you removed power supply PS1.1. Put the circuit breaker in the Off (‘0’) position

Página 43 - Step 0620-011

Step 0610-001A message in Perspectives indicated that you have a power problem and Table 1-1 on page 1-4 orTable 1-2 on page 1-5 directed you to this

Página 44

Step 0610-005When you put the circuit breaker into the On (‘1’) position, the circuit breaker tripped into the Off (‘0’)position.1. Have the customer

Página 45

v If yes:a. Have the customer remove the SP Switch from the active configuration and power off the SPSwitch.b. Go to “Step 0610-010”.v If no:a. Fix an

Página 46 - Step 0620-012

a. Replace the front chassis cable.b. Return to “Step 0610-004” on page 1-14 to verify the replacement cable.v If no:a. Replace the circuit breaker.b.

Página 47 - SP: System Service Guide

splstdata -n | pg5. From the system file server, log into “primary” processor node as root using the telnet command:telnetPrimaryNodename6. Check errp

Página 48

Table 1-7. SP Switch error conditionsError # Message/condition Description and action2(SPS)Initialized Description: Initialization detected a wrapped

Página 49 - Step 0620-023

Note!Before using this information and the product it supports, read the information in “Safety and environmental notices” onpage ix and “Notices” on

Página 50 - Step 0620-026

Table 1-7. SP Switch error conditions (continued)Error # Message/condition Description and action−3(SPS)Device status: Device has beenremoved from net

Página 51 - Step 0620-029

Table 1-7. SP Switch error conditions (continued)Error # Message/condition Description and action−8(SPS)Device status: Device has beenremoved from net

Página 52 - Step 0620-032

Refer to notes at beginning of “SP Switch function (MAP 0620)” on page 1-17 for more informationon cable connections and logical-to-physical frame tra

Página 53 - Step 0620-035

1. Make sure a wrap plug is properly installed on the connector. Refer to Figure 1-2 on page 1-4 for viewsof the switch wrap plugs.2. Have customer ch

Página 54 - Step 0620-038

v If yes:a. An SRN was obtained from diagnostics.b. Use the following SRN table (Table 1-9) to continue service.c. After using Table 1-9, go to “Step

Página 55 - Step 0620-042

Table 1-9. Service Request Number (SRN) table for SP Switch adapters (continued)Service Request NumberSRNsource Failing component(s) Description763-20

Página 56 - Step 0620-043

Table 1-9. Service Request Number (SRN) table for SP Switch adapters (continued)Service Request NumberSRNsource Failing component(s) Description764-2A

Página 57 - Chapter 2. Locations

Table 1-10. Switch problem priority listingPriority Failing component Action1(1 of 7)Software a. Have customer verify that the software is configureda

Página 58 - Connection location (ZZZZ)

Step 0620-013An SRN listed in Table 1-9 on page 1-24 indicated that you have a switch clock problem and Priority 2 inTable 1-10 on page 1-27 directed

Página 59 - Chapter 2. Locations 2-3

Step 0620-019Since the diagnostics did not return an SRN, no problem was detected.1. Have you just reseated, repaired, or replaced a component?v If ye

Página 60

ContentsFigures ...vTables ...viiSafety and environmental notices ...

Página 61 - Chapter 2. Locations 2-5

Note: When unplugging the two ends of the suspect cable, check /var/adm/SPlogs/css/out.top toverify only two (2) ports were lost. If four (4) ports we

Página 62 - Frame locations

v If yes, go to “Step 0620-027”.v If no:a. The problem switch is providing the master clock for the system.b. Have customer use the Eclock command to

Página 63 - Chapter 2. Locations 2-7

v S00-BH-J95. Disconnect the switch data cable at the tailgate of the frame containing the processor node.6. Connect the end of the processor node dat

Página 64 - Air Baffle

Step 0620-033All ground straps connecting the frames make adequate contact at both ends.1. Disconnect clock source data cable at S00-BH-J3, J5, J7, or

Página 65 - Cable routing

5. Set the switch clock selections on the “problem” switches (refer to “Selecting appropriate switch clocks”on page 3-6).6. Run advanced diagnostics o

Página 66

5. Look for an SRN indicating a clock problem, such as “External clock” being listed as one of the failingcomponents.6. Do the “css0” diagnostics fail

Página 67 - Chapter 2. Locations 2-11

2. Put the SP Switch’s circuit breaker into the On (‘1’) position.3. Go to “Step 0620-043” to verify fix.Step 0620-043You have replaced switch compone

Página 68

Chapter 2. LocationsNaming standard for RS/6000 SP components ...2-1Format structure ...2-1Example of fo

Página 69 - Switch data cables

– 01 - 99 for frames 1-99 (specific to that frame)Notes:1. E01 designates RS/6000 SP physical frame 12. L00 designates any/all RS/6000 SP logical fram

Página 70

Front and rear views of RS/6000 SP frameFigure 2-1 shows a front view of the RS/6000 SP frame locations. “Frame (FRA)” on page 2-6 describesthe assemb

Página 71 - Chapter 3. Service procedures

Selecting the switch clock source ...3-6Determining the correct switch clock source ...3-6Removing and restori

Página 72 - Table 3-2. Setup output files

Figure 2-2 shows a front view of the RS/6000 SP multi-switch frame.Figure 2-3 on page 2-5 shows a front view of the Model 3AX (49-inch) frame.Main Pow

Página 73 - Using the css.snap script

Figure notes:1. Wide processor nodes take up an entire shelf position (two thin processor node slots). They areidentified by the odd numbered position

Página 74 - Node supervisor verification

Note: See notes under Figure 2-1 on page 2-3 for processor node/switch assembly numbering.Frame locationsFigure 2-1 on page 2-3 shows a front view of

Página 75 - Frame supervisor verification

G6: Front door groundG7: Rear door groundG8: GroundSW: Power-on switchLD: LED cardFC: Front coverRC: Rear coverExample: E01-FRA-G1Chapter 2. Locations

Página 76

Switch assembly locationsFan 5P6 P4P5Fan 4 Fan 3Fan 2 Fan 1CB & LED CardJ1 J2Switch PlanarPowerSupply 2SupervisorCardPowerSupply 1Supervisor Bus

Página 77

Connector detailsFigure 2-6 shows RS/6000 SP component connector details.Cable routingFigure 2-7 on page 2-10 and Figure 2-8 on page 2-10 show back vi

Página 78 - Viewing switch partitions

Note: When attaching exterior and interior cables to a POWER3 SMP High Node allow for enough cablefor a 2-foot service loop for node movement into ser

Página 79 - Service position procedures

Table 2-1 shows external cable routing in a RS/6000 SP frame populated with 16 processor nodes. (Referto “Cable routing” on page 2-9 to see the routin

Página 80

Figure 2-9. Frame cable routing paths in rear of RS/6000 SP multi-switch frame (F/C 2030/1) — 1.93 m frameFigure 2-10. Frame cable routing paths in re

Página 81

Switch data cablesSPS data cablesTable 2-2 describes the attachment locations and routing for the internal SPS Switch data cables:Table 2-2. SPS Switc

Página 82

Figures1-1. SP Switch high-level diagram...1-21-2. SP Switch wrap plugs ...1-41-3. SP Switch inner chass

Página 83 - Antistatic bag

2-14 RS/6000 SP: SP Switch Service Guide

Página 84 - Replacing the switch assembly

Chapter 3. Service proceduresPersonal ESD requirements ...3-1Tools and files overview...3-1Using t

Página 85 - Replacing the switch fans

Table 3-1. Service procedure toolsUtility (see note) Runs on Descriptionfault_service_Worm_RTG All nodes Monitors the switch for faults. It restarts t

Página 86

Table 3-3. Tuning output files (continued)File (see note) Location Descriptiondaemon.stderr Primary A record of which nodes were not initialized.out.t

Página 87 - Supervisor

The files ending in .out are produced by running the appropriate command to dump internal (in memory)trace information or dump data to a file. The com

Página 88

2. In the Node pane, click the icon of the node you want to verify3. Click the ″Notebook″ icon on the tool barv When the Notebook window opens, make c

Página 89

v ″Yes″ displayed in a red box indicates that the switch supervisor has failed and it is notresponding to the frame supervisor.Note: Clicking ″Help″ i

Página 90

1 Input 1 (BH-J3 for SPS)2 Input 2 (BH-J4 for SPS)3 Input 3 (BH-J5 for SPS)Table 3-4. Setting switch clock sourcesModelNumber of LogicalFramesMaster C

Página 91 - Chapter 5. Parts catalog

6. The customer can re-initialize the switch using the Estart command. The frame and processor nodeswhich were removed in this procedure will appear i

Página 92

Efence of primary and primary backup nodesBy design, Efence of primary and primary backup nodes is not allowed.If you attempt to fence either of these

Página 93 - Chapter 5. Parts catalog 5-3

vi RS/6000 SP: SP Switch Service Guide

Página 94

d. Choose “Normal Mode”e. Choose “Display Current Bootlist”This will display the current bootlist.2. Power down the node, service it, and hook it back

Página 95 - Chapter 5. Parts catalog 5-5

The following 3 adapters require functional microcode to be installed:Adapter PackageESCON®Control Unit Adapters Feature 2756 ESCONBLKMUX S/370™Contro

Página 96

To complete the microcode update, it is usually necessary to remove and then replace the device from theconfiguration. The most reliable method to do

Página 97 - Chapter 5. Parts catalog 5-7

Chapter 4. FRU removals and replacementsHandling static-sensitive devices ...4-1Procedures for switch assemblies ...

Página 98 - Switch cables (feature)

Procedures for switch assembliesCAUTION:The unit weight exceeds 18 Kg (40 lbs) and requires two service personnel to lift.(SPSFC002)Attention: Compone

Página 99 - Chapter 5. Parts catalog 5-9

Removing the switch fansNote: Refer to “Handling static-sensitive devices” on page 4-1 before removing or installing ESD sensitivedevices.Perform thes

Página 100

Perform these procedures to remove the fan control cable from an SP Switch assembly:1. Perform “Placing a switch assembly into service position” on pa

Página 101 - Chapter 5. Parts catalog 5-11

Replacing the switch supervisor cardPerform these procedures to replace the supervisor card in an SP Switch assembly:1. Insert supervisor card.2. Rota

Página 102

Replacing the switch inner chassis cablePerform these procedures to replace the supervisor power cable from an SP Switch assembly:1. Plug connectors P

Página 103 - Trademarks

4. Remove power supply card.Replacing the switch power cardsPerform these procedures to replace the switch power cards) in an SP Switch assembly:1. In

Página 104 - European Union (EU) statement

Tables1-1. Switch problem diagnostics ...1-41-2. Environmental messages for switches ...1-51-3. Switch connect

Página 105 - Radio protection for Germany

4-8 RS/6000 SP: SP Switch Service Guide

Página 106

Chapter 5. Parts catalogSPS, SPS-8 Switch assembly (feature) (view 1) ...5-2SPS, SPS-8 Switch assembly (feature) (view 2) ...

Página 107

SPS, SPS-8 Switch assembly (feature) (view 1)5-2 RS/6000 SP: SP Switch Service Guide

Página 108

Table 5-1. SPS, SPS-8 Switch assembly (feature) (view 1)AssemblyindexPart number Units DescriptionSPS Switch assembly (reference only)SPS-8 Switch ass

Página 109 - Index X-3

SPS, SPS-8 Switch assembly (feature) (view 2)5-4 RS/6000 SP: SP Switch Service Guide

Página 110

Table 5-2. SPS, SPS-8 Switch assembly (feature) (view 2)AssemblyindexPart number Units DescriptionSPS Switch assembly (reference only)SPS-8 Switch ass

Página 111

SPS, SPS-8 Switch assembly (feature) (view 3)87654321Air flow5-6 RS/6000 SP: SP Switch Service Guide

Página 112 - GA22-7443-04

Table 5-3. SPS, SPS-8 Switch assembly (feature) (view 3)AssemblyindexPart number Units DescriptionSPS switch assembly (reference only)SPS-8 switch ass

Página 113

Switch cables (feature)Table 5-4. Switch cables (feature)AssemblyindexPart number Units DescriptionSP Switch data cables (SPS)11J6091 AR Cable, Switch

Página 114

Chapter 5. Parts catalog 5-9

Comentários a estes Manuais

Sem comentários